New project implementation has begun at a timber factory in the city of Picalevo.
A contract has been signed with MM-EFIMOVSKY timber factory, a subsidiary of Austrian concern Mayr-Melnhof Holz GmbH.
According to it Bureau of Cabling Technologies will design and install an intelligent cable system with 200 communication ports.
The unified information network will integrate ten stand-alone buildings. An intelligent control system PatchView PV MAX using Cat-6 copper cable will be deployed at the factory to manage the SCS.


